Trackage & Electrification

Primary Corridors

Milepost summaries and dispatching subdivisions surveyed during autumn 2026 field trips.

Coast Subdivision (MP 47.0 – MP 0.0)

Double-track CTC mainline with four-track passing sidings at Lawrence and Bayshore. Maximum authorized speed 79 mph for passenger consists.

Martinez & Niles Subdivisions

Shared freight/passenger right-of-way running along Suisun Bay with lift-bridge clearances monitored at Benicia-Martinez.

Cascades Point Defiance Bypass

Inland alignment between Tacoma Dome and Nisqually reducing freight interference along the southern Puget Sound shoreline.